Layout Status Report

Current layout condition and member-reported problems.

Current Layout StatusOperational
Unresolved Reports0
Last UpdatedOct 14, 2026 6:07 PM
DANGER: The bridge wiring micro switches have been bypassed. You are responsible for damage caused if you lift the bridge while a train is on it or dumped into the casim.

Member Observations

DateLocation / AreaObservationReported ByStatus
Oct 10, 2026 5:09 PM Blue is ok We are good on blue
Officer note: No issues in Blue or Blue Alt
Paul Resolved
Oct 5, 2026 3:34 PM Bridge Out? Is the bridge still an issue? If it is what are the plans?
Officer note: Dave 1.0 and Peter are working on fixing it, Peter found a replacement switch that can handle the Red, Yellow & Blue line power independently. Dave and Peter are arranging to replace our bridge switches. Thanks Guys!
Richard Resolved
Oct 5, 2026 12:34 PM Blue to Alternate Blue Dead Spot On the north end of the steel mill the blue to alternate blue, where the tower is, has a dead spot aprox 4" long.
Officer note: There were a whole bunch of cold solder joints, which Buzz repaired. Richard ran around the blue/alt successfully.
Richard Resolved